M&P Gadsden
Consulting Engineers Ltd
Tel: 01229 813333
Another scheme with Enviro Building Solutions Ltd. We undertook the structural design of this multiple classroom facility constructed using a mixture of timber and cold formed steel sections. The advantages of this type of construction is the speed of erection on-site. This was constructed in 8 weeks.